The first step involved before initiating a project is checking the technical feasibility of the same. Various steps involved in this study / survey are as under:
- Site Visit (with check list).
- Study site conditions.
- Study terrain and alignment.
- Presentation – About Company.
- Presentation – About Ropeway (if required by client).
- Report - within 15 days of return containing following:
- Our observations.
- Type of ropeway proposed.
- Capacity proposed (mutually agreed by UBL & client).
- Scheme.
- Rough estimate.