The detailed survey of a project is carried out in case the report of Preliminary Survey is affirmative. Various steps involved in Detailed Survey are as under:
- Topographical survey with instruments.
- Prepare topographical drawings.
- Propose approximate parameters of the ropeway.
- Prepare profile diagram.
- Project estimation.
- Approximate operating cost of the project.
- Report containing following:
- Observations at site.
- Topographical maps.
- Profile diagram.
- Tentative Parameters sheet.
- Write up on scheme and system proposed.
- Rough project estimation.
- Operating cost sheet.